Pricing and shipping

How to Calculate Landed Cost When Importing from China

Estimate landed cost for a China order with a worked example, freight, duties, local charges and a checklist for comparing supplier quotes.

A supplier’s product price is only one part of the cost of getting an order into your warehouse. Freight, insurance, customs duties, taxes and destination charges can change the amount you pay per usable unit. A useful landed-cost estimate follows the actual shipment from the supplier to a named delivery point and labels every figure as confirmed, quoted or estimated. The worked example below is fictional and is not a tariff quote for any country.

Dock workers and shipping containers on a cargo vessel at a port

1. Start with the destination and the price basis

Choose the endpoint first: for example, your warehouse at a named address, not simply “the destination port”. Then identify the quantity, product version, currency and the supplier’s quoted delivery term and named place. A price for collection at a factory will cover a different part of the journey from a quote that includes further delivery. The same shipment can generate invoices from several parties, so write down who pays each leg.

The EXW, FOB and DDP guide explains why a named place and agreed responsibilities matter. Incoterms allocate certain delivery, cost and risk responsibilities; they do not replace a detailed quote or automatically describe every commercial service. Ask the seller and forwarder to identify the charges included, excluded and payable separately, and avoid adding the same freight or local handling twice.

  • Product, variation, quantity and purchase currency
  • Supplier price, delivery term and named handover place
  • Destination country and final delivery address
  • Quote date, validity and the owner of each cost

2. Build the estimate from distinct cost lines

Start with the product purchase cost and add only costs that fall outside that purchase price. Depending on the agreed scope, these may include China-side collection or export handling, international freight, cargo insurance, import duties, non-recoverable taxes, customs brokerage, destination terminal charges and delivery to the warehouse. Add inspection or other buying costs when they are part of the calculation you are using, and label them separately. Some quotations include several services under one line; request a breakdown before comparing them.

Freight depends on the confirmed packing and service. Request final carton dimensions and CBM, gross weight, package count and any stackability or cargo restrictions. Mark supplier estimates as preliminary until the forwarder confirms the chargeable basis and applicable minimums. A marketplace listing’s package dimensions or price tier should not be treated as a final freight quote.

3. Worked example: 500 units to a buyer’s warehouse

Assume a fictional order of 500 identical units at US$8 each: US$4,000 for goods. For this example only, assume separate China pickup and origin handling of US$150, ocean freight of US$600, insurance of US$50, import duty of US$400, destination clearance charges of US$120 and final delivery of US$180. The US$400 duty is an invented planning input: for illustration it equals 10% of an assumed US$4,000 duty base. It is not a tariff, valuation rule or quote for an actual product or destination.

Add the amounts once: US$4,000 + US$150 + US$600 + US$50 + US$400 + US$120 + US$180 = US$5,500. Divide by 500 received, usable units and the illustrative landed cost is US$11.00 per unit. This example assumes no import VAT or other taxes, inspection fee, bank charge, storage, duties on other components or loss. Add any applicable amounts separately; do not use the example as an actual landed-cost quotation.

  • Goods: 500 × US$8 = US$4,000
  • Origin handling US$150 + freight US$600 + insurance US$50 = US$800
  • Illustrative duty US$400 + clearance US$120 + delivery US$180 = US$700
  • Estimated total: US$5,500 ÷ 500 usable units = US$11.00 per unit

4. Confirm duty, tax and freight assumptions

The importing country determines the applicable classification, origin rules, valuation method, duty, taxes and clearance requirements. Ask your customs broker or qualified adviser to confirm the relevant classification and current treatment for the actual goods and shipment. Do not assume that the supplier’s proposed HS code, an online rate, a generic percentage or a rate for another destination is sufficient. U.S. CBP describes its own invoice-value requirements; other destinations can use different valuation rules.

Ask the forwarder for the actual service, route, chargeable basis, origin and destination fees, validity and exclusions. The LCL and FCL shipping guide explains why a shared-container quote and a full-container quote need matching cargo and delivery assumptions. For VAT or similar import taxes, track the cash due at clearance separately from any amount potentially recoverable later; recovery depends on local rules and your business circumstances and should be confirmed with your adviser.

5. Compare offers on the same basis

Suppose supplier A quotes US$8 per unit at one named handover point and supplier B quotes US$8.40 with a different delivery scope. The lower product price is not enough to identify the lower landed cost. Match product specification, order quantity, packaging, payment currency, named place, transport scope, timing and destination. Then add the missing legs to each scenario. Clearly label any cost that both offers include and any service neither supplier has confirmed.

Use the same version of your requirements to compare supplier quotes fairly. If a new carton configuration changes freight or a different material changes classification, update the affected assumptions rather than merely changing the unit price. Save the source and validity date of each figure so the team can see which estimate needs refreshing before a deposit or booking.

6. Test the numbers against uncertainty

A useful estimate has a base case and a small number of alternatives. For example, recalculate the model if final freight rises, the shipment needs additional destination handling, or the number of usable units is lower. In the fictional US$5,500 example, if 490 units are usable and the total spend remains unchanged, allocating that spend across those units gives about US$11.22 each. That is a management planning calculation, not a claim about how a customs value or financial accounts must be calculated.

Keep possible storage, demurrage or detention, currency conversion, bank fees and product rework in an assumptions or contingency section rather than inventing a universal percentage. Do not hide uncertain costs inside a “zero” line. Assign an owner and a date for confirming each open amount. A landed cost is different from a selling price or profit: sales fees, overheads and taxes on profit may need separate consideration.

7. Information to gather before the next quote

Ask for the exact product and packaging version, quantity split, supplier location, delivery term and named place, estimated packed dimensions and weight, cargo-ready date, destination and the services already included. Ask the forwarder and broker for written quotations with the same route, currency, chargeable basis, validity, taxes, responsibilities and exclusions. Identify which data is still estimated and when it will be confirmed.

Keep those details with the product links and purchase context in a China Sourcing Team sourcing request if you want the sourcing requirement reviewed. Support starts from US$1,000 and the scope is agreed after review. A sourcing brief is a starting point for discussion; the actual landed cost depends on the confirmed goods, destination and service quotes.

Sources and further reading

Service-specific information checked on 2026-10-27. Confirm the terms for your shipment with the selected provider.

Ready to organize a product?

Use the China sourcing request form for one item, review the completed sourcing brief example, or read about the guided Chrome helper for a multi-product project. Sourcing support starts from US$1,000 and is subject to scope review.

Continue reading

More China sourcing articles.